02210 - Earth Excavation Backfill Fill and Grading

02210 - Earth Excavation Backfill Fill and Grading

Method Statement for Backfilling and Compaction Procedure

Jul 03, 2020 · III. Materials • Measuring Tape • Spray Paints • Steel Pegs/Pins • Approved Structural earth fill to be used as backfill Approval of backfilling material will be received before using it on site. • Warning/Identification Tape: Standard 4 mil polyethylene 76mm (3 inches) wide tape, detectable type, with an appropriate color suitable for utility imprinted with information …

Get a Quote

Bidding Requirements and Contract Forms

Nov 18, 2021 · 02160 Temporary Excavation Support Systems 02210 Earth Excavation, Backfill, Fill, and Grading 02223 Screened Gravel 02224 Back-Run Gravel 02225 Select Borrow 02435 Crushed Stone 02480 Landscaping 02615 Ductile-Iron Pipe and Fittings 03300 Cast-in-Place Concrete 11304 Submersible Solids Handling Pumps and Appurtenance 15056 Pipe Supports

Get a Quote

TABLE OF CONTENTS - Salem

02210 Earth Excavation, Backfill, Fill and Grading 02252 02273 Precast Concrete Manholes Geotextile Fabric 02480 Landscaping 02498 Restoration of Disturbed Areas 02500 Paving and Surfacing 02524 Curbs, Walks, and Driveways 02590 02604 Brick and Concrete Block Masonry Catch Basins 02610 Pipe Testing and Cleaning

Get a Quote

Bidding Requirements and Contract Forms

Nov 19, 2021 · Section 02160 – Temporary Excavation Support Systems Section 02210 – Earth Excavation, Backfill, Fill, and Grading Section 02223 – Screened Gravel Section 02224 – Bank-run Gravel Section 02225 – Select Borrow Section 02435 – Crushed Stone Section 02480 – Landscaping Section 02615 – Ductile-Iron Pipe and Fittings

Get a Quote

02210 - Earth Excavation Backfill Fill and Grading

Earth Excavation, ECAWP 60% Design Fill and Grading Package 1 11/19/21 02210-1 SECTION 02210 EARTH EXCAVATION, FILL AND GRADING PART 1 - GENERAL 1.01 DESCRIPTION: A. Perform the folowl ngi earh et xcavaonit ba, ckf f,lli alli nd grading as indicaetd or specfieid: B. Make excavations to accommodate piping, conduits, foundations, and other

Get a Quote

Backfilling and Grading: Considerations for Builders | 2

Compacting: Backfill just a few feet at a time in small lifts, and use a compactor with every lift. Capping: Be sure to cap your backfill with clay or another low-porosity soil; make sure to slope your backfilled area away from the home. Downspouts: Ensure that your extensions flush water at least 5 to 10 feet away from the home's foundation.

Get a Quote

2210.2 TRENCH DAM DETAIL.dwg' - Cambridge, Ma

Difference between grading and backfilling - Earthwork/grading enginee…

Get a Quote

City of Marco Island - dnhiggins.com

02210 Earth Excavation, Backfill, Fill and Grading 02615 Ductile-Iron Pipe and Fittings DIVISION 3 - CONCRETE 03100 Concrete Formwork 03200 Concrete Reinforcement 03300 Cast-In-Place Concrete 03732 Existing Concrete Preparation DIVISION 4 - MASONRY - (NOT USED) DIVISION 5 – METALS - (NOT USED) DIVISION 6 - WOOD AND PLASTIC - (NOT USED)

Get a Quote

SPECIFICATIONS, DURHAM WATERLINE REMEDIAL DESIGN …

02160 Excavation Support Systems 02210 Earth Excavation, Backfill, Fill, and Grading 02211 Rock Excavation and Disposal 02223 Screened Gravel 02224 Bank -Run or Crushed Gravel 02225 Select Borrow 02230 Site Clearing 02240 Dewatering 02241 Construction Water Management 02273 Geotextile Fabric 02371 Riprap 02400 Temporary Cofferdam

Get a Quote

INDEX SECTION 02230 - EARTHWORK, SHAFTS 1.2 QUALITY

EARTHWORK, SHAFTS 02230-4 3.4 EXCAVATION A. Contractor shall excavate materials encountered within limits of work that will allow for safety, placement of machinery, and fill placement. B Contractor shall excavate around the entrance of the shafts as is needed to allow for placement of fill materials and as shown on the Plans.

Get a Quote

CHAPTER 2 EARTHWORK 2.1 SCOPE: 2.2 GENERAL

Earthwork shall consist of all necessary site clearing and grubbing, excavation and backfill for structures and trenches, site grading, grassing and restoration, as well as related work as shown on the plans and as specified herein. 2.2 GENERAL: All earthwork shall be confined to the construction area as shown on the plans, and shall be done

Get a Quote

Difference between grading and backfilling - Earthwork

Sep 12, 2019 · 02160 Excavation Support Systems 02210 Earth Excavation, Backfill, Fill, and Grading 02211 Rock Excavation and Disposal 02223 Screened Gravel 02224 Bank -Run or Crushed Gravel 02225 Select Borrow 02230 Site Clearing 02240 Dewatering 02241 Construction Water Management 02273 Geotextile Fabric 02371 Riprap 02400 Temporary Cofferdam

Get a Quote

CONTRACT AND SPECIFICATIONS FOR Essex Street Utility …

02210 Earth Excavation, Backfill, Fill and Grading 02252 Precast Concrete Manholes 02273 Geotextile Fabric 02498 Restoration of Disturbed Areas 02500 Paving and Surfacing 02524 Curbs, Walks, and Driveways 02590 Brick and Concrete Block Masonry 02604 Catch Basins 02610 Pipe Testing and Cleaning 02615 Ductile Iron Pipe and Fittings

Get a Quote

DRAFT - 11/19/2021 TABLE OF CONTENTS DIVISION 1 - …

02210 Earth Excavation, Backfill, Fill and Grading 02225 Select Borrow 02310 Soil Stabilization (Lime Treatment) 02481 Site Precast Architectural Concrete 02482 Precast Unit Pavers 02483 Site Granite 02484 Site Furnishings 02485 Planting Soil Preparation, and Finishing Grading 02486 Planting Materials 02487 Planting Accessories

Get a Quote

TABLE OF CONTENTS DIVISION 0 - BIDDING AND CONTRACT

02095 Transportation and Disposal of Soil and Fill 02100 Site Preparation and Tree Pruning 02140 Dewatering 02160 Temporary Excavation Support Systems 02210 Earth Excavation, Backfill, Fill and Grading 02252 Manholes 02500 Paving and Surfacing 02510 Hot Mix Asphalt Porous Paving 02524 Curbs, Walks, and Driveways 02534 Building Inflow Removal

Get a Quote

STANDARD CONSTRUCTION SPECIFICATIONS FOR …

foundation material for utility installation; and 3) excavation and backfill for building structures and retaining walls. Article 1.2 Definitions A. Backfill Material placed in an excavated area. B. Bedding Ground or support in which pipe is laid. C. Borrow Material used as fill and/or backfill which is obtained from a source other than

Get a Quote

Construction Specification 23—Earthfill

Earth backfill—Earth backfill adjacent to structures shall be compacted to a density equivalent to that of the sur-rounding inplace earth material or adjacent required earthfill or earth backfill. Compaction shall be accomplished by hand tamping or manually directed power tampers, plate vibrators, walk-behind, miniature, or self-propelled

Get a Quote

BID PROPOSAL FOR INSTALLATION OF LOW PRESSURE …

02210 Earth Excavation, Backfill, Fill and Grading 02211 Rock Excavation and Disposal . Low Pressure Sanitary Force Main Riverview Avenue, Branford, Connecticut TABLE OF CONTENTS 0002-2 02224 Compacted Gravel 02225 Processed Aggregate Base 02435 Crushed Stone

Get a Quote

DIVISION 2 – SITE CONSTRUCTION SECTTION NO. SECTION …

Difference between grading and backfilling - Earthwork/grading enginee…

Get a Quote

SECTION 31 23 00 EXCAVATION AND FILL PART 1 GENERAL

SECTION 31 23 00 EXCAVATION AND FILL PART 1 – GENERAL 1.01 WORK A. Excavation INCLUDED and fill for: 1. Building pads and foundations. ent areas. Waterways and ditches (including inlet structures and outlet ditches). ection 31 11 00 Clearing and Grubbing ng and Grading Topsoil

Get a Quote